- Project Description (Fence - Paint or Fence - Replace)
- Description/Quantity (including measurement basis such as Linear Ft, Sq Ft, etc.)
- Useful Life (Yrs)
- Remaining Useful Life (Yrs), where 0 is the initial planning year
- Current Replacement Cost (includes installation, salvage, disposal, etc.)
Any assets that is worth more than 1% of the annual budget must included in the reserve study or noted why its not included.
Additional useful information such as:
- Cost Basis (current cost by square yards, linear feet, each, etc.)
- Freight and labor (costs to receive and install)
- Salvage (estimated value of the item when replaced, if any)
- Date placed in service or the date last maintained or replaced